UVE · SIMULATEUR
PRESENTATION SHEET SCADA ENVIRONMENT · OPERATOR TRAINING

A full plant to operate. Zero real-world consequences.

A waste-to-energy operating simulator: grate combustion, water-steam cycle, turbine, flue-gas treatment. Faithful to a real distributed control system.

Built for operator training and practice.

Professional tool · named access by subscription

PLANT OVERVIEW · FULL PROCESS ● RUNNING
BUNKER UREA FURNACE BOILER G TURBINE AIR-COOLED COND. DEAERATOR FLUE-GAS FILTER STACK
851°C
T2S
6.2%
O₂
42.0t/h
STEAM
18.4MW
LOAD
3
Incineration lines
IED
2010/75/EU compliant
FR·EN
Bilingual interface
1 Hz
Real-time physics engine
AI
Built-in tutor & copilot
01

Parts list

CAPABILITIES · 8 SUBSYSTEMS

Every subsystem is modelled, instrumented and controllable, just like a real control desk. From waste to the power grid.

ITEM
DESIGNATION
DESCRIPTION
PROCESS REF.
01
Grate combustion
Multi-zone furnace, feed, primary/secondary air, 2-second temperature control.
T2S ≥ 850 °C
02
Water-steam cycle
Drum, superheaters, economizer, desuperheating, feedwater pumps and level control.
HP 78 bar · 424 °C
03
Turbine & generator
Start-up, run-up, grid synchronization, bleeds, island mode and bypass.
TG · SYNC · ISLANDING
04
Flue-gas treatment
Reagent injection, bag filter, emissions monitoring (CEMS) and consumable stocks.
FGT · CEMS
05
Start-up / shutdown
Step-by-step guided start-up and shutdown, per line, with interlocks and emergency stop.
SEQ · INTERLOCKS
06
Burner management (BMS)
Burner safety logic: purge, ignition, run, shutdown and lockout.
BMS · FSM
07
Alarm management
Prioritized alarm banner, journal, acknowledgement, following ISA-18.2 / EEMUA 191 principles.
ISA-18.2
08
Training scenarios
Upset conditions to recover from, with objectives, guided feedback and scored evaluation.
SCORE · FEEDBACK
02

General notes

REALISM · REQUIREMENTS

Not an animation: a coherent process model, instrumented with control-room rigor.

NOTE 01

Real P&ID drawings

Control loops and safeties translated from plant drawings and logic diagrams.

NOTE 02

Industrial tag naming

Instrument tags and equipment references (TT, PT, FT) as on site.

NOTE 03

Physics engine

Heat balances, steam enthalpies, PID controllers, smoothing: computed every second.

NOTE 04

IED emissions compliance

Rolling averages, limit values and continuous monitoring per IED Directive Annex VI.

NOTE 05

AI operating assistant

Two AIs built into the desk: a tutor that reads the live state and explains the “why” (trips, interlocks, emissions), and a copilot that proposes the right maneuvers. The operator confirms every action, up to chaining a full sequence (e.g. turbine start-up).

03

Views

REAL SIMULATOR SCREENSHOTS

Real operating views, not mockups. And the assessment screen the trainee gets at the end of a scenario.

THE FILM53 SECONDS · NO SOUND
One degraded situation, from the temperature drop to the scored assessment.
VIEW APLANT OVERVIEW
Synoptique général du simulateur
3 lines · combustion → grid
VIEW BCONTROL & TURBINE
Fenêtres DCS et boucles PID
DCS windows · PID loops
VIEW CTRENDS & ALARMS
Tendances temps réel et alarmes
Real-time history · A/W/I
VIEW DASSESSMENT & DEBRIEF
Debrief de fin de scénario : note, critères d'évaluation et chronologie des manœuvres
Score out of 20 · criteria met · maneuver timeline
04

Access & Pricing

SUBSCRIPTION · NAMED ACCESS

Three plans to fit your need. Secure, named access, on request.

OPERATOR

1 seat · evaluation or individual learner

On request
  • Full simulator: 3 lines, real-time
  • Secure named access
  • Bilingual FR / EN interface
  • Training scenarios & evaluation
  • Built-in AI tutor & copilot
Request a quote
TEAM / SHIFT

Several operators · training group

On request
  • Everything in Operator
  • Multiple named seats
  • Instructor mode: tracking & evaluation
  • Priority support
Request a quote
SITE / CENTER

Plant operator · training center · EPC

On request
  • Everything in Team
  • Site-wide access
  • Custom scenarios
  • Onboarding & dedicated support
  • Updates included
Request a quote

Pricing tailored to operator count and access duration. A controlled, named-access tool granted after subscription. Already a client? Client login →

ABOUT

“Distilling years of operating and commissioning waste-to-energy plants into a tool where you learn by doing.”

Built by a commissioning engineer · waste-to-energy & process control

Ready to take the controls?

A controlled-access training tool. Request your access. Quick reply.

Request access

Or write to [email protected]