Short articles on the things that make up the operation of a waste-to-energy plant. The substance of the job, and why it is learned by doing.
Why the two-second temperature gates the permit to incinerate, what the IED requires, and what the operator monitors.
The four coupling conditions, the interlocks that check them, and what is prepared before synchronisation.
ELVs, rolling averages, continuous measurement and abatement reagents: emissions compliance, from the control room.